Reviewing S&W Results In-Month
Overview
If your account uses sediment and water (S&W) testing, you can mark results Valid or Invalid before month-end. Those marks can then appear on a month-end S&W mailer, when that mailer is configured.
The form template name varies. A common example is a CTR / S&W test template.
Directions
- Go to Forms > Templates.
- Open the S&W (or CTR) test template used on the account.
- Filter to the current month.
- Open a test from the list.
- Use the image links to preview or download supporting images.
- Press Update Status in the top right corner
- Set the result to Validated or Invalidated as desired.



When a month-end S&W mailer is configured, marked statuses populate in the status column of that report (the column letter depends on the template).